Home Printer Friendly Page Increase Font Size Decrease Font Size
Listen with BrowseAloud

Summer Road Construction/Closures


Interactive Map


Summer Road Construction



Current Construction:

Road Start Date Planned Completion
Grey Road 40 from Grey Road 10 to Concession 12 2016-05-16 2016-06-10
Grey Road 40 from Concession 12 to Grey Road 3 2016-05-16 2016-06-10

Planned Construction:

Road Start Date Planned Completion
Grey Road 113 from Grey Road 13 to Orchard Drive 2016-06-06 2016-06-30
Grey Road 113 from Orchard Drive to 7m S of Beaver St S 2016-06-06 2016-06-30
Grey Road 3 from Bentinck-Sullivan Townline to Sideroad 9A 2016-06-06 2016-06-24
Grey Road 31 from Grey Road 2 to Road 55 2016-06-06 2016-07-15
Grey Road 31 from 800m East of Pretty River Road to Osprey-Clearview Townline 2016-06-06 2016-07-15
Grey Road 31 from Pretty River Road to 800m East of Pretty River Road 2016-06-06 2016-07-15
Grey Road 31 from Road 57B to Pretty River Road 2016-06-06 2016-07-15
Grey Road 31 from Road 55 to Road 57B 2016-06-06 2016-07-15
Grey Road 31from Grey Road 31 to 800m South of Grey Road 31 2016-06-06 2016-07-15
Grey Road 12 from 150 m West of Baseline to Baseline 2016-06-06 2016-06-30
Grey Road 13 from 165 m North West of Napier St to 200 m North West of Napier St 2016-06-06 2016-06-30
Grey Road 13 from 20 m North East of Louisa St to 40 m North East of Louisa St 2016-06-06 2016-06-30
Grey Road 13 from 60 m South West of Abbotts Lane to Abbotts Lane 2016-06-06 2016-06-30
Grey Road 19 from 180 m West of Heritage Dr to 240 m South East of Happy Valley Rd 2016-06-06 2016-06-30
Grey Road 19 from 180 m North of Craigleith Rd to 200 m North of Craigleith Rd 2016-06-06 2016-06-30
Grey Road 4 from 10 m East of Artemesia-Glenelg Tline to 105m East of Artemesia-Glenelg Tline 2016-06-06 2016-06-30
Grey Road 17 from 1.2 km S of Concession 14 to Concession 14 2016-06-27 2016-09-02
Grey Road 17 from Grey Road 170 to 1.2 km S of Concession 14 2016-06-27 2016-09-02
Grey Road 170 from Highway 6 to 1.5 km S of Concession 1 SCD 2016-06-27 2016-09-02
Grey Road 170 from 1.5 km S of Concession 1 SCD to Concession 1 SCD 2016-06-27 2016-09-02
Grey Road 170 from Concession 1 SCD to 400m East of Concession 2 NCD 2016-06-27 2016-09-02
Grey Road 8 from Highway 89 to Southgate Road 04 2016-07-04 2016-08-19
Grey Road 8 from Southgate Road 04 to Southgate Road 10 2016-07-04 2016-08-19
Grey Road 8 from Southgate Road 10 to Southgate Road 12 2016-07-04 2016-08-19
Grey Road 8 from Southgate Road 12 to Southgate Road 14 2016-07-04 2016-08-19
Grey Road 8 from Southgate Road 14 to Grey Road 9 2016-07-04 2016-08-19
Grey Road 9 from Southgate SRD 21 to Grey Road 8 2016-07-04 2016-08-19
Grey Road 12 from Sideroad 4A to Sideroad 7A 2016-08-02 2016-09-16
Grey Road 12 from Sideroad 7A to Sideroad 16B 2016-08-02 2016-09-16
Grey Road 12 from Sideroad 16B to Sideroad 22A 2016-08-02 2016-09-16
Grey Road 12 from 11th Line to 9th Line 2016-08-02 2016-09-16
Grey Road 12 from Sideroad 22B to Grey Road 40 2016-08-02 2016-09-16

This information is updated as conditions change.

 

Notices

 

This information is provided as a public service. Although we endeavour to ensure that the information is as current and accurate as possible, errors do occasionally occur. Therefore, we cannot guarantee the accuracy of the information. Readers should, where possible, verify the information before relying on it.


Want updates direct to your desktop or phone? Follow us on twitter.
  

Contact Usroads@grey.ca

Responses will be made during regular business hours, Monday to Friday 8:00am to 4:30pm.

You are Here: Home / Services / Transportation Services / Summer Road Construction/Closures